Cowell Smokestack Demolition
/The stack was 235 feet above grade, poured in place concrete thawas 22-1/2 feet in diameter at the base; tapering to 18-1/2 feet at the top.
Read MoreThe stack was 235 feet above grade, poured in place concrete thawas 22-1/2 feet in diameter at the base; tapering to 18-1/2 feet at the top.
Read MoreMarking the start of the new Transbay Terminal Project dubbed “The Grand Central Station of the West”, EBI was on board as the Prime contractor to demolish the aging concrete bus ramps.
Read MoreSelective structural demolition amplified. Removal of the roof and third floor of the former Macy’s department store is just another day at the mall for Evans Brothers.
Emergency response to demolish a fire damaged structure that was under construction. Worked along side the GC and Cal/OSHA to develop a plan to safely collapse a damaged tower crane.
Powered by Squarespace.