Evans Brothers Inc.
  • ABOUT
  • Earthwork Demolition Site Preparation
  • Projects
  • Contact
Evans Brothers Inc.
  • ABOUT/
  • Services/
    • Earthwork
    • Demolition
    • Site Preparation
  • Projects/
  • Contact/
5409923918_2a61661d22_o.jpg
Evans Brothers Inc.

Full service Site Preparation

Projects

Evans Brothers Inc.
  • ABOUT/
  • Services/
    • Earthwork
    • Demolition
    • Site Preparation
  • Projects/
  • Contact/
March 26, 2019

Cowell Smokestack Demolition

March 26, 2019/ Wil Evans
Cowell Smokestack Demolition

The stack was 235 feet above grade, poured in place concrete thawas 22-1/2 feet in diameter at the base; tapering to 18-1/2 feet at the top.

Read More
March 26, 2019/ Wil Evans/ 1 Comment
Demolition
March 20, 2019

Transbay Terminal and Ramps Demolition

March 20, 2019/ Wil Evans
Transbay Terminal and Ramps Demolition

Marking the start of the new Transbay Terminal Project dubbed “The Grand Central Station of the West”, EBI was on board as the Prime contractor to demolish the aging concrete bus ramps.

Read More
March 20, 2019/ Wil Evans/ 2 Comments
Demolition
SF, Transbay Terminal
March 03, 2019

LAX Hanger Demolition and Deluge System Modifications

March 03, 2019/ Jose Raymundo
LAX Hanger Demolition and Deluge System Modifications

The Demolition of Low Bay Hangar and Sky Chefs Building and Deluge System Modifications Project had it all. From the complete demolition of aircraft hangars to erecting a 1.5 million gallon bolted steel tank at break-neck speeds, EBI and its incredible team of sub-vendors are proud to have carried this project to its successful completion.

Read More
March 03, 2019/ Jose Raymundo/ Comment
February 26, 2019

Google Charleston East

February 26, 2019/ Wil Evans

Over 40,000 cubic yards of structural excavation is nearly inconceivable, but not when working in the Google world. Evans Brothers is a year into this massive structural excavation endeavor and continues to work on interior footings while the marquee canopies begin to take shape overhead.

IMG951772.jpg
IMG957619.jpg
IMG957621.jpg
IMG951772.jpg IMG957619.jpg IMG957621.jpg
February 26, 2019/ Wil Evans/ Comment
Structural Excavation

Wil Evans

February 25, 2019

Stonestown Galleria

February 25, 2019/ Wil Evans

Selective structural demolition amplified. Removal of the roof and third floor of the former Macy’s department store is just another day at the mall for Evans Brothers.

IMG_20190125_093735.jpg
February 25, 2019/ Wil Evans/ Comment
Demolition

Wil Evans

February 25, 2019

875 California

February 25, 2019/ Wil Evans
875 California

Hard rock excavation to 40 feet below the intersection California and Powell. With cable cars and tourist flocking to Nob Hill, Evans Brothers got to the bottom without a hiccup.

Read More
February 25, 2019/ Wil Evans/
March 01, 2016

Trinity Phase 4

March 01, 2016/ Wil Evans

Internally braced mass excavation using conveyors to reach depths approaching 70’ below existing grade.

IMG_20180627_093451.jpg
IMG_20180618_112423.jpg
March 01, 2016/ Wil Evans/ Comment
Excavation, Conveyors

Wil Evans

March 01, 2016

Oakland Valdez Fire

March 01, 2016/ Wil Evans

Emergency response to demolish a fire damaged structure that was under construction. Worked along side the GC and Cal/OSHA to develop a plan to safely collapse a damaged tower crane.

IMG_20170708_100954.jpg
March 01, 2016/ Wil Evans/ Comment
Demolition

Wil Evans

March 01, 2016

Kaiser Redwood City

March 01, 2016/ Wil Evans

Mass excavation for new subterranean parking garage for the Kaiser MOB in Redwood City. Over 90,000 cubic yards of soil excavated and offhauled for reuse.

March 01, 2016/ Wil Evans/ Comment
Excavation

Wil Evans

  • ABOUT/
  • Services/
    • Earthwork
    • Demolition
    • Site Preparation
  • Projects/
  • Contact/

Evans Brothers Inc.

Powered by Squarespace.