Cowell Smokestack Demolition
/The stack was 235 feet above grade, poured in place concrete thawas 22-1/2 feet in diameter at the base; tapering to 18-1/2 feet at the top.
Read MoreThe stack was 235 feet above grade, poured in place concrete thawas 22-1/2 feet in diameter at the base; tapering to 18-1/2 feet at the top.
Read MoreMarking the start of the new Transbay Terminal Project dubbed “The Grand Central Station of the West”, EBI was on board as the Prime contractor to demolish the aging concrete bus ramps.
Read MoreThe Demolition of Low Bay Hangar and Sky Chefs Building and Deluge System Modifications Project had it all. From the complete demolition of aircraft hangars to erecting a 1.5 million gallon bolted steel tank at break-neck speeds, EBI and its incredible team of sub-vendors are proud to have carried this project to its successful completion.
Read MoreOver 40,000 cubic yards of structural excavation is nearly inconceivable, but not when working in the Google world. Evans Brothers is a year into this massive structural excavation endeavor and continues to work on interior footings while the marquee canopies begin to take shape overhead.
Selective structural demolition amplified. Removal of the roof and third floor of the former Macy’s department store is just another day at the mall for Evans Brothers.
Hard rock excavation to 40 feet below the intersection California and Powell. With cable cars and tourist flocking to Nob Hill, Evans Brothers got to the bottom without a hiccup.
Read MoreEmergency response to demolish a fire damaged structure that was under construction. Worked along side the GC and Cal/OSHA to develop a plan to safely collapse a damaged tower crane.
Mass excavation for new subterranean parking garage for the Kaiser MOB in Redwood City. Over 90,000 cubic yards of soil excavated and offhauled for reuse.
Powered by Squarespace.